BIM (Revit) Coordination

Intelligent Models.
Clash-Free Construction. 

ppa delivers full BIM coordination using Autodesk Revit, Navisworks, and Forma Design Collaboration, producing fully coordinated three-dimensional models across all MEP disciplines. Our BIM capability ensures clash-free designs, streamlined construction, and accurate as-built records, reducing cost, programme risk, and on-site abortive work.

BIM (Revit) Coordination Overview

We develop detailed Revit models for all MEP services, mechanical, electrical, plumbing, and public health, coordinated against architectural and structural models. Clash detection is carried out using Navisworks Manage or Forma Design Collaboration, with regular coordination meetings to resolve issues before they reach site. 

ppa holds the BSI Kitemark for BIM Design and Construction, reflecting our commitment to ISO 19650-compliant workflows. All BIM deliverables are produced in accordance with the Employer's Information Requirements (EIR) and Project BIM Execution Plan (BEP), ensuring consistent quality and data standards throughout the project lifecycle. 

Cooling Tower_R1.jpg
Generator Bay_R1.jpg

Scope of Service

  • Full MEP Revit model development to LOD 100–400

​

Model Reviewing via Dalux 

  • Multi-discipline clash detection and coordination using Navisworks 

  • BIM Execution Plan (BEP) preparation and information management

​

Asset Data and Scheduling 

  • As-built model production and handover data management 

Revit Modelling

  • Mechanical systems modelling (HVAC, ductwork, plant) 

  • Electrical systems modelling (containment, equipment, lighting) 

  • Plumbing and public health systems modelling 

  • Fire protection and sprinkler system modelling

​

Below Ground Sevices modelling  

  • Model development from LOD 100 through to LOD 400 as required 

Clash Detection & Coordination

  • Multi-discipline coordination using Navisworks Manage or Forma Design Collaboration 

  • Clash detection reports and resolution tracking 

  • Regular multi-discipline coordination meetings and model reviews 

  • Spatial coordination with architectural and structural teams 

  • Federated model management using Forma Collaborate Pro 

Information Management & Handover

  • ISO 19650 compliant information management and delivery accreditation as Lead Appointed Party 

  • Employer's Information Requirements (EIR) response and BEP authoring 

  • Common Data Environment (CDE) management and file control 

  • Asset data production for facilities management handover 

  • As-built model updating and record model submission at project completion 

Design Process

Concept & Feasibility

Review of EIR, BIM goals, and project information requirements. Preparation of the BIM Execution Plan and establishment of CDE and naming conventions. 

Schematic Design

Initial Revit model development at LOD 100–200. First coordination clash reports issued and resolved in coordination with the design team. 

Detailed Design

Full LOD 300 model development. Weekly coordination meetings, clash detection runs, and resolution tracking until a clash-free model is achieved. 

IFC Documentation

LOD 400 IFC models issued with full MEP content, equipment data, and COBie information ready for construction use and subsequent FM handover. 